Herndon Substation
Storage foundation for transformers, shotcrete for SPCC basins and asphalt roads.
Scope: Installed one 40’ x 200’ x 15” and one 30’ x 65’ x 6” concrete transformer storage foundation. Excavated to design grade for roads and concrete storage slabs, exported dirt and imported base rock for compaction. Installed 70,945 square feet of asphalt at roads. Installed 200’ x 10’ x 4” of shotcrete for drainage swale. Demoed and off-hauled concrete foundations.
Budget: $1,400,000. Total dollars spent to date: $1,095,000–22 percent under budget.
|